Design Defect Claim
Aug 01, 2019OUTCOME: Case was settled favorably for my client
Design-Build general contractor claimed the engineer of record negligently designed the MEP systems which resulted in additional costs incurred which were not able to be recouped from the owner because ... the changes occurred after the contractor went "at-risk" based on the engineers preliminary information.