Lockheed – Astronaut’s Turning Basin
Dec 02, 1996OUTCOME: Arbitration - De minimus Award
Multi-party delay case involving an a alleged erroneous pre-dredge hydrographic survey that the dredging contractor alleged resulted in significant damages to its dredging equipment, and delay-related ... damages in the millions of dollars. Civil engineering client was alleged to have generated an erroneous hydrographic survey that reportedly failed to properly depict the location of the actual navigable waterways of the canals and turning basin wherein the Space Shuttle’s solid rocket boosters are transported and recovered for over-land transport and refurbishment by NASA. The case was tried before a Panel of very experienced construction arbitrators in Federal Court. Mr. Gibson successfully defended the civil engineering client. The Plaintiff dredging contractor received an award of only $26,000, a sum that was only a small fraction of the Plaintiff dredging contractor's claims.